Înapoi la articole →

Cel mai recent articol

Ultima verificare

Urmăritori 0 urmăritori
Articole: 199
  1. Lowest Largest U-turn Berm

    The Lowest Largest U-Turn is too tight for large marbles to stay on the track, so it needs a berm.

  2. Squarehead jumps up

    Today began a shift into a new phase of construction.

  3. Lower Zig Zag 3F Lower Support

    History: 2019 Jun 21: Autosticks headed up to support the Lower Zig Zag 3F

  4. Caret Splitter Feeder Extension Reflection Protection

    These will be rails along the Caret Splitter Feeder Extension Reflection.

  5. Caret Splitter Feeder Guider

    These will be rails along the Caret Splitter Feeder and Caret Splitter Feeder Extension.

  6. started third orange marble

    Today went pretty smoothly as I got the third marble started down the Triple Splitter Small Feeder after using color-coded markers to ensure it would go down at the same rate/locations as the first two marbles had.

  7. Triple Splitter Small Feeder Feeder

    This track is ostensibly going to deliver small marbles into the Triple Splitter Small Feeder.

  8. Started second orange marble

    Today I streamed for a bit over an hour and got the second orange marble started rolling down the Triple Splitter Small Feeder.

  9. Lowest Largest Backtrack

    The Lowest Largest Backtrack is made up of Lowest Largest Backtracking Chopstick and Lowest Largest Backtracking Popsicle Stick which take large marbles from Snake Plate U Turn down to the Lowest Largest U-Turn History: 2019 May 07: built months ago, but…

  10. Startled Squarehead

    Today I took several frames but some of them had to be deleted.

  11. Lower Zig Zag 2F

    History: 2020 Dec 19: Autosticks came up to keep small marbles from falling sideways off Lower Zig Zag 2F.

  12. Lower Zig Zag 1F

    History: 2021 Jan 12: The end of an Autostick has arrived to fill in one more spot. 2021 Jan 02: Autosticks came up to fix a spot where small marbles can get stuck, becoming Lower Zig Zag 1F Inner Rails 2019 May 05: recently named lowest track of the Lower

  13. Lower Zig Zag 3F Upper Base

    History: 2019 May 05: planned to be created by adding toothpicks to Lower Zig Zag 3F Upper Base Base

  14. Lower Zig Zag 2F top

    This piece was needed to keep small marbles on the Lower Zig Zag 2F up and out of the way of the large marbles on the Triple Splitter.

  15. Lower Zig Zag 3F

    This track will be the third track in the Lower Zig Zag.

  16. Lower Zig Zag 3F Upper Base Base

    These are two toothpicks that make up the Lower Zig Zag Net, which was put in place to catch small marbles as they fall from the (newly named) Lower Zig Zag 2F to Lower Zig Zag 1F History: 2019 May 03: Determined to be a good support for Lower Zig Zag 3F…

  17. planning next parts

    Today’s livestream was over two hours, during which I got 9 frames taken.

  18. super spoony brought small marbles

    Today’s livestream was in two parts.

  19. Snakes rolled away

    After a couple of misfires with my computer acting like it could not keep up with all its tasks, I rebooted and tested the small orange marbles rolling down the Triple Splitter Small Feeder to the (top of the) Triple Splitter, where they immediately fall…

  20. Glued Triple Splitter Small Feeder Outer Bar

    This was a relatively quick livestream in which I was just able to glue the Triple Splitter Small Feeder Outer Bar before I had to go. 11:56 Monday 29 April 2019 JST The next day, I noticed the outer bar was glued a little bit higher than the inner bar on…

  21. curved triple splitter small feeder outer bar

    Today I finished curving the Triple Splitter Small Feeder Outer Bar.

  22. Triple Splitter Small Feeder Outer Bar Lower Support

    This piece is a small bit of the upper end of a chopstick, cut at a slant so it matches the Triple Splitter Small Feeder Inner Bar Lower Support.

  23. Glued Triple Splitter Small Feeder Inner Bar

    In just a bit over an hour, I got the Triple Splitter Small Feeder Inner Bar moved and glued in place.

  24. Finished Curving Triple Splitter Small Feeder Inner Bar

    Great progress in terms of frames today.

  25. G Choppy floats down

    Another 1.5 hours of livestream (but my hour counter is currently broken, blarg) and got G Choppy to float down to the stage so he has easier access to curve the Triple Splitter Small Feeder Inner Bar.

  26. G Choppy bending triple splitter small feeder inner bar

    Today’s first livestream went pretty quickly.

  27. ready to glue triple splitter small feeder inner bar

    Today after getting the stage set up again after holiday, I bent and glued different sticks to speed up filming next time.

  28. Triple Splitter Small Feeder Inner Bar Lower Support

    History: 2019 Mar 05: Carried up the ramp by Pinky.

  29. Almost glued inner bar support

    Today I took 11 frames.

  30. Caret Splitter Feeder Extension Reflection Second Stanchion

    Backpack Jack carried this and patiently held it until it could be glued by Mr McGlue.

  31. Glued Caret Splitter Right Hand Inner Side

    Today was a three hour livestream, which should have put me over 300 hours; I think I was pretty close already.

  32. Testing Marbles Again

    Today, due to a traffic jam of sorts back by the Decorative Walls, it took 34 minutes to get the first frame taken.

  33. Introduced lower levels of MT3

    Not a livestream in the construction sense, but this was a livestream to introduce the track at its current state. highest tracks: Lower Zig Zag Triple Splitter Caret Splitter Feeder Extension Reflection

  34. Caret Splitter Rudder

    The Caret Splitter Rudder is as yet an imaginary piece which will be toggled by medium marbles to ensure make small marbles go to the left or right down the Caret Splitter.

  35. Starting to Build the Track

    Dr Sugar instructs Candy Mama to turn the Bearing on faster than ever before.

  36. Installing the Bearing

    Candy Mama goes offstage to get a longer lever with which she can put the switch into a higher speed than before.

  37. Testing the Bearing

    Everyone who ran away before now runs across the stage, with a spooky flying bearing behind them.

  38. Setting the Stage

    Squarehead leads Rabby onto the set as Rabby drags a round circular plate behind him.

  39. Garinoppi

    Garinoppi is a helpful spooky skeleton who works as a radio operator for the track.

  40. Pinky

    Pinky is a character who was present in the first attempt at making Marble Track 3 in 2011.

  41. Super Spoony

    Super Spoony head is a relatively new character whose job is to bring marbles to the stage.

  42. Lil Brother

    They don’t have names but I called them the big brother and little brother.

  43. Big Brother

    They don’t have names but I called them the big brother and little brother.

  44. Squarehead

    The movie starts with Squarehead walking backwards, leading Rabby forward with the stage.

  45. Reversible Guy

    After moving this guy around, I noticed that he looks just about the same whether facing forwards or backwards so there was a gag during which he goes just off the set and was magically going back onto the set without having had time to turn around.

  46. Dr Sugar

    Dr Sugar is the manager.

  47. G Choppy, professional cutter

    G Choppy is one of the characters who has a very specific job.

  48. Mr McGlue

    Mr McGlue has a very specific job.

  49. Candy Mama

    Candy Mama is one of the first characters on the set, and somewhat of a manager character.