Creează un cont pentru a te abona la acest blog și a-i urmări articolele pe pagina Lectură.
-
I started today by deleting 7 frames that I determined should be reshot as Reversible Guy should be standing the stick upright instead of putting it onto the track.
-
The weather is getting hotter.
-
Pretty great progress today as: Doctor Sugar picked up the stick that had tripped him.
-
Today I took some time to create an archway that will go over the Left Side Small Landing Zone, and another OSS which will go in front of Pinky’s Decorative Walls after the Lowest Small-Medium Splitter.
-
Hopefully will help keep marbles on the Lowest Small-Medium Splitter by keeping them from bouncing off the Caret Splitter Feeder Extension Reflection Stanchion and ricocheting onto The First Track.
-
This circle will hopefully hold The Lowest Longest Separator in place properly.
-
Someone did not carefully measure the width of the Caret Splitter Feeder Extension Reflection Protection so two new pieces need to be installed.
-
Someone did not carefully measure the width of the Caret Splitter Feeder Extension Reflection Protection so two new pieces need to be installed.
-
(not to be confused with the shorter (and lower) Bar Below Circle by Caret Splitter.)
-
This short bamboo wedge prevents the flatness of the Medium Catcher Below Triple Splitter from stalling medium sized marbles.
-
Today in two hours of livestream, I was overall super productive for the construction of Marble Track 3 and took zero frames of video!
-
Keeps small marbles from getting stuck when falling from Lower Zig Zag 3F to Lower Zig Zag 2F.
-
This piece is 50mm tall and will go just inside the Outer Spiral from where Eleventh placed Outer Spiral Support is located just outside Pinky’s Decorative Walls after the Lowest Small-Medium Splitter.
-
Today I did a happy dance after putting el Lifty Lever Guider into place.. because it worked!
-
Today’s livestreaming was done in two parts.
-
This is a composite piece made out of a rectangular bamboo skewer.
-
This piece is 55mm tall, and will go just outside Pinky’s Decorative Walls.
-
These vertical toothpicks catch small marbles as the transition from Lower Zig Zag 3F to Lower Zig Zag 2F.
-
Today, Squarehead continued to not hit the switch as the stage pulls him around.
-
Great progress today, adding 10 frames to the video.
-
This piece separates the Lower Zig Zag from the Triple Splitter Small Feeder because the point at which they are closest, the tracks are headed opposite directions.
-
This small piece of bamboo keeps marbles on Lower Zig Zag 3F headed into the Lower Zig Zag 3F 2F Net.
-
For a few weeks I have been fluttering the Caret Splitter Rudder down to Reversible Guy.
-
Will be at the top of the Caret Splitter Rudder Lever Spinner.
-
Today I spent some time stabilizing the camera; it had gotten bumped in the week of not filming.
-
Today the Caret Splitter Rudder began fluttering in earnest on its way down to be caught by Reversible Guy in about 30 frames from now.
-
Today most of the time was spent adding little numbered strips of paper to the track so I can ensure it rotates at the right speed for the Caret Splitter Rudder to flutter down to Reversible Guy so he can catch it without really moving as the stage rotates
-
The First Track and the Front Left Medium Landing Zone arrive close to each other under the Outer Spiral.
-
Not many frames taken today, but I made great headway in planning what will be a cool effect of the Caret Splitter Rudder fluttering down into the hands of Reversible Guy, fully 3 seconds from now in the video.
-
History: 2020 Jan 28: Reversible Guy attached the Caret Splitter Rudder to this piece. 2019 Nov 26: Reversible Guy caught this piece out of the sky
-
Today Reversible Guy caught the Caret Splitter Rudder Holder which will soon be part of the Caret Splitter Rudder, which should fall from the sky soon.
-
History: 2020 Jun 02: Reversible Guy installed el Lifty Lever Guider around el Lifty Lever 2019 Nov 19: Mr Greene started carrying it onto the set.
-
Today I spent some time planning and making el Lifty Lever.
-
History: 2019 Oct 01: Held by Mr Greene off camera, ready to bring it in after the current marble testing is complete
-
Today I took a pic showing how close The First Track is with Bar Below Circle by Caret Splitter Today I took only 10 frames in 2 hours, which is slower than I would have guessed given how quickly the first frame was taken.
-
Today’s livestream ended up in two parts because my computer stopped working (ran out of space on /dev and others), but it was readily cleared up by rebooting the machine.
-
Happy Birthday Dad!
-
Today was a recent record in terms of frames taken; there were times with only a single character moving.
-
Today I spent nearly an hour preparing for the first frame, which included measuring the Caret Splitter Feeder Righter Guider.
-
History: 2019 Sep 09:
-
During each hour of today’s livestream, I took enough frames for about 1 second of video.
-
History: 2019 Sep 09:
-
History: 2019 Sep 09: resting on CSF
-
This is a thin piece of bamboo held in place by the Caret Splitter Feeder Guider Lower Supporter and the Caret Splitter Feeder Guider Upper Supporter which will hold medium and small marbles on the Caret Splitter Feeder and Caret Splitter Feeder Extension…
-
History: 2019 Jul 30: Almost installed by Doctor Sugar.
-
History: 2019 Jul 30: Glued into place by Mr McGlue.
-
Today’s livestream was done in 2 parts, for a total of over 3 hours I think.
-
Today I got several frames added to the video despite having to delete a few.
-
History: 2019 Jul 16: Placed by Reversible Guy from Backpack Jack’s backpack.
-
Today after cutting the sticks Squarehead was holding, I was surprised to see how much longer they looked on camera, even though they were the exact same sticks.