Creează un cont pentru a te abona la acest blog și a-i urmări articolele pe pagina Lectură.
-
Spector sweater I started the project and finished the neck already but I’m not sure I like how it turned out because of the colour pooling.
-
Gradient sweater Colour I knit a swatch to test the gradient/faded combo for my next sweater.
-
Kalajoki Finished the sock finally!!
-
Project recap Ravelry: PurringYarn’s Outline Tee - Ginger Ver.
-
Emma Top Finished the top yesterday and photographed today.
-
Project recap Ravelry: PurringYarn’s EMMA Top Time spent: 38 hours Yarn: Drops Safran (78 Forest Green) Needle: 2.75mm/US 2, 3.0mm/US 2.5 Duration: [2026-07-25 Sat]-[2026-08-08 Sat] Pattern: EMMA Top by Susanne Müller Yarn planning Initially I was planning
-
From Kalajoki Socks to Slip Stitch Lines Socks After giving up on the ridiculous ultra-lace weight yarn on Kalajoki socks, I only have the Emma Top as my only WIP project left, but even that will be done soon and I already got a bit tired of it.
-
Kalajoki Socks This is going soooooo slow that I can’t stand it any longer!!!
-
Emma Top Finished the left front.
-
Emma Top Almost finished the left front but I think the length is too crop to my liking.
-
Project recap Ravelry: PurringYarn’s cancun boxy lace top - Beige Ver.
-
Cancun Boxy Lace Top Finally finished knitting…!!
-
Cancun Boxy Lace Top Finally I found a lace top to knit with this stiffy yarn.
-
Emma Top I knitted the swatch using the Loveyarn 丝语 (cotton/linen).
-
Sassy Classy Top Done!
-
Project recap Ravelry: PurringYarn’s Sassyclassycroptop - Celeste Blue Ver.
-
Sassy Classy Top Well, I have to say this colour is lovely.
-
Sample Knit #2 I tried three different ways of neater 1x1 ribbing: Hem: normal knit + Eastern purl Right sleeve: Eastern knit + normal purl Left sleeve: Eastern knit + Eastern purl So far, the last one looks the best, but I still want to see how they are…
-
Sample Knit #2 Finished the 1x1 ribbing of the body.
-
Sample Knit #1: Mini Scarf Just handed in my first sample knit!
-
Project recap Ravelry: PurringYarn’s Mini Scarf ◈SAMPLE◈ Time spent: 13 hours Yarn: Cherished Fibres Cashmere Fingering (Sandalwood) Needle: US 4/3.5mm Duration: [2026-06-02 Tue]-[2026-06-05 Fri] Pattern: City Walk Scarf Mini by Sixian (Angela) Wu My first
-
Sassy Classy Top, and Thoughts about Pattern Design Finished the turtle neck part.
-
Project recap Ravelry: PurringYarn’s Walk in the park socks Time spent: 30 hours Yarn: MC: The Knitting Loft Boots CC1: Lang Yarns Jawoll Superwash 75/25 (69 Blau Meliert) CC2: Loveyarn 回归线 知足 (Green 圣诞绿) Needle: US 1/2.25mm Duration: [2026-03-26 Thu]-[20…
-
Project recap Ravelry: PurringYarn’s Camisole No. 7 - Lavender Mist Ver.
-
Camisole No.7 My yarn finally arrived from the sea and I can start swatching.
-
Project recap Ravelry: PurringYarn’s Tracery Time spent: 72.5 hours Yarn: MC: Loveyarn 回归线 悸动 (墨黑 black) CC: Ancient Arts Fibre Crafts Revival (A Summer in Monaco - Monet) Needle: US 2/2.75mm (main), US 1/2.25mm (ribbing) Gauge: 30 sts = 4" Duration: [202…
-
Tracery vest Finished the front panel and the front left.
-
Project recap Ravelry: PurringYarn’s April Cardigan - Pistachio Ver.
-
Tracery vest My colourwork was awful for the first ten rows because I wasn’t paying lots of attention to it.
-
April Cardigan I’ve finished everything except the button, still waiting it to be delivered.
-
Project recap Ravelry: PurringYarn’s Helix Basic socks - Seventies Stripes Ver.
-
April Cardigan The double knitted button band is taking forever and I’m not even half way through it.
-
April Cardigan Finished the body including the hem (40cm stockinette + 9cm ribbing) Remaining 2 skeins: 59g + 72g
-
April Cardigan Finished the increase finally and just separated sleeves and body.
-
Project recap Ravelry: PurringYarn’s Time Traveler Socks Time spent: 25 hours Yarn: Zwerger Garn Opal Hundertwasser 4-fach / 4-ply (2100 Nachbarn) Needle: US 0/2.0mm Duration: [2026-02-27 Fri]-[2026-03-08 Sun] Pattern: Time Traveler Socks by Liz Sedmak Ya…
-
Time Traveller Socks I’ve been practicing flicking purl with this project.
-
Project recap Ravelry: PurringYarn’s Non-felted Slippers - Latte Ver.
-
Time Traveller Socks CO this socks two days ago using Judy’s magic cast on.
-
Project recap Ravelry: PurringYarn’s Versa Cowl Time spent: 10 hours Yarn: MC-a (yellow): CaMaRose Lamauld(6400 Karrygul) MC-b (light yellow): Rosa Pomar Vovó (580A) + Rauma Alpakka Lin (6561) MC-c (yellow-orange): Rosa Pomar Vovó (580A) + Biches & Bûches…
-
Twinkle sweater Reworking on this one.
-
Project recap Ravelry: PurringYarn’s Anjou Vest - Red&Blue Ver.
-
Anjou Vest It expanded quite a bit after blocking.
-
Anjou Vest Finished the left front.
-
Heart and Chain Sweater OMG it looks gorgeous on me after blocking!!
-
Project recap Ravelry: PurringYarn’s Heart Chain Sweater - Ivory Dress Ver.
-
Anjou I casted on yesterday and almost finished the back yoke, but I decided to frog and start over because it looks too busy.
-
Heart and Chain Sweater Finished the right sleeve and got 15g left for the 2nd skein, meaning one sleeve costs 85g merino yarn.
-
Heart and Chain Sweater It’s endless…!!
-
Heart and Chain Sweater Knitted a little more than four and half diamonds in the front.
-
Heart and Chain Sweater I finished the folded collar yesterday.