Creează un cont pentru a te abona la acest blog și a-i urmări articolele pe pagina Lectură.
-
On the evening of September 3, 2025, there was suddenly a strong and remarkably unpleasant flat metallic odour in our master bedroom and ensuite.
-
On December 14, 2024 – three weeks after I published the last exciting installment in this series of posts – our new Redflow ZCell battery, which replaced the original one which had developed a leak in the electrode stack, itself failed due to a leak in t…
-
My wife and I were with Optus for our mobile phone service since approximately the dawn of time, but recently decided to switch to another provider.
-
Our 5.94kW solar array with Redflow ZCell battery and Victron Energy inverter/charger system is now slightly over three years old, which means it’s time to review its third year of operation.
-
It’s time for a review of the second year of operation of our Redflow ZCell battery and Victron Energy inverter/charger system.
-
Last week I had occasion to test deploying ceph-csi on a k3s cluster, so that Kubernetes workloads could access block storage provided by an external Ceph cluster.
-
In my last post, I wrote about how I taught sesdev (originally a tool for deploying Ceph clusters on virtual machines) to deploy k3s, because I wanted a little sandbox in which I could break learn more about Kubernetes.
-
We – that is to say the storage team at SUSE – have a tool we’ve been using for the past few years to help with development and testing of Ceph on SUSE Linux.
-
Back in 2012, I received a box of eight hundred openSUSE 12.1 promo DVDs, which I then set out to distribute to local Linux users’ groups, tech conferences, other SUSE crew in Australia, and so forth.
-
It’s been a little over a year since our Redflow ZCell battery and Victron Energy inverter/charger kit were installed on our existing 5.94kW solar array.