Creează un cont pentru a te abona la acest blog și a-i urmări articolele pe pagina Lectură.
-
This was supposed to be a few quick checks of our blimp frame.
-
As a follow-up to our original Grond post, there have been some cool new developments.
-
It has been a while, but we are moving ahead again.
-
In continuation on the material preparation and its assessment we prepared the first workshop test matrix for the Phase II TPU envelope material.
-
As per our Phase II planning we reached moment where some material decisions needed to be done also to prevent Phase I material fiasco.
-
As part of our Phase II envelope design, we wanted to understand how the interface between two adjacent hulls affects turbulence and parasitic drag.
-
Long story short, we ended visiting The Museum of Military History in Vienna on the 2nd of January and it was great!
-
Being a happy Creality owner for years, using it as a workhorse for our project prototyping in a good and bad days.
-
Over the weekend we finally achieved something worth reporting!
-
Why we’re doing this In Phase I, long signal cables (servos, ESC control) ran alongside high-amps power wiring.
-
In 2021, I wrote a blog post Helium vs.
-
It’s been a journey.