← Înapoi la Urmăritori

Cel mai recent articol

Ultima verificare

Urmăritori 0 urmăritori
Articole: 12
  1. Fun with SkyCiv

    This was supposed to be a few quick checks of our blimp frame.

  2. As a follow-up to our original Grond post, there have been some cool new developments.

  3. It has been a while, but we are moving ahead again.

  4. In continuation on the material preparation and its assessment we prepared the first workshop test matrix for the Phase II TPU envelope material.

  5. As per our Phase II planning we reached moment where some material decisions needed to be done also to prevent Phase I material fiasco.

  6. As part of our Phase II envelope design, we wanted to understand how the interface between two adjacent hulls affects turbulence and parasitic drag.

  7. Long story short, we ended visiting The Museum of Military History in Vienna on the 2nd of January and it was great!

  8. Being a happy Creality owner for years, using it as a workhorse for our project prototyping in a good and bad days.

  9. Over the weekend we finally achieved something worth reporting!

  10. Why we’re doing this In Phase I, long signal cables (servos, ESC control) ran alongside high-amps power wiring.

  11. In 2021, I wrote a blog post Helium vs.

  12. Phase I Wrap up

    It’s been a journey.